Skip to content
Tim Magoun

First bench bring-up

March 3, 2026

Getting serial output, clocks, and a repeatable power-up checklist in place.

The goal for this pass was simple: power the board safely, confirm the clock tree, and get one stable serial log out of reset.

I linked the next write-up once the debug path was stable: Measurement loop cleanup.

The project page keeps the full timeline in one place: Embedded Systems Lab.